Skip to content

Roofing

Roofers as a subcontracted package

Pitched roofs, flat roofs and roof timberwork as a defined package with our own foreman for main contractors, construction companies and developers. Documented experience: roof renewal on residential buildings in the Netherlands. Whether we take on your roof, with what composition and when, is stated only in the written offer.

Our focus includes Luxembourg, southern Germany, the Netherlands, Belgium and Norway.

The problem we solve

The roof structure is up or the renewal is planned, but the covering is missing from the programme and the following trades are waiting for the building to be weathertight.

Why contact us

One contact and our own foreman
The foreman organises the work on site and coordinates it with your site manager.
A clear written offer
Scope, team, programme, price and responsibilities are written down before work starts.
We assess document requirements up front
Before the project starts, we assess the applicable document and posting requirements according to the country, the project and the workers' status.
Flexible capacity
Our own workers, partner crews under contract and specialists selected for the order.

Roofing: pitched roofs, flat roofs and timber

  • 01

    Pitched roofs

    Battens, roof membrane, tile and sheet-metal covering, plus insulation where it is in the agreed scope.

  • 02

    Flat roofs

    Build-up and waterproofing to your specification. State the material, falls, junctions and existing condition; the offer confirms whether and how we take the package on.

  • 03

    Roof timberwork

    Trusses, rafters and roof decking up to the covering; the interface with timber frame work is named in the scope.

  • 04

    Renewal on existing buildings

    Stripping the old covering, removing solar panels and fitting the new covering, where that is in the scope.

  • 05

    What we need for an offer

    Roof drawings, roof shape and pitch, areas, existing build-up, required covering, junctions and access; for existing buildings also photographs.

  • 06

    Scaffold, fall protection, sheet-metal work

    Who provides the scaffold and hoist, who answers for fall protection and who carries out gutters and flashings is written into the contract before the start.

Who it is for

  • Main contractors whose building must be weathertight to programme
  • Construction companies that let the roof package separately
  • Roofing companies that pass on a defined package for a project
  • Developers and commercial clients in housing and renovation

How the team is formed

Foreman and roofers
The foreman organises the crew on the roof and follows the programme together with your site manager.
Own crew or partner
The offer states whether the roof will be carried out by our own workers, a partner crew under contract or selected specialists.
Composition by roof
Roof area, access and weather window decide the crew size, which is set for the project.

Cooperation models

  • Subcontract – a work package

    We carry out the agreed scope with our own foreman and are responsible for our part under the contract. You set the scope and accept the completed work.

  • A crew for a project phase

    A team led by our foreman carries out an agreed phase; responsibilities are set out in the contract.

  • Direct hire

    We select specialists whom you employ in your own company.

Legal model by country

In Germany, Austria and the Netherlands we carry out roofing only under a contract for work (Werkvertrag, aanneming van werk), never as the provision of workers. In Germany the roofing craft (no. 4) and the carpentry craft (no. 3) are in Annex A of the Handwerksordnung and are therefore licensed crafts: a foreign company first notifies the competent chamber of crafts, and work can begin after that if the legal conditions are met. According to the Federal Employment Agency, the roofing craft is also a collective-agreement area of its own with its own social fund. These are general rules; which documents exist for your project is named in the offer.

The specific requirements depend on the type of work, the contract model and the workers' status, so we confirm them separately for each project. This information is not legal advice and does not imply automatic approval or eligibility.

How cooperation works

  1. 01

    Enquiry

    Type of work, location, trades, approximate numbers and timing – as much as you know. An e-mail address is enough.

  2. 02

    Assessment and offer

    We check feasibility and the legal model and prepare an individual written offer.

  3. 03

    Contract and documents

    We agree scope, responsibilities and accommodation. Before the project starts, we assess the applicable document and posting requirements according to the country, the project and the workers' status.

  4. 04

    Mobilisation and work

    The team arrives according to the agreed plan, and you have one contact person for the whole project.

Experience and evidence

In 2024–2025, together with local contractors in the Netherlands, we renewed tiled and reed roofs on residential buildings, including insulation, scaffolding and hoist installation and removal of solar panels. The projects page describes our roofing work in that country. We publish no project description for flat roofs or for roof timberwork alone.

Projects →

Submit your project for a subcontracting proposal

The work package is already ticked in the form – change it if needed. We reply in writing; price and terms are quoted individually.

Send what you have: drawings, a bill of quantities (BOQ) or a short description of the works. Only a contact is required.

How we can reach you

We reply in writing, by email. A phone number is optional.

Works required
Country
Start

Files cannot be uploaded on this site. Paste a link, or email the files to info@nonstopgroup.lt after you submit, quoting your request number.

Add project details (optional)
Project type
Duration

Figures you enter describe your request only. They are not a price offer or a contract price; terms are agreed in writing after we have reviewed the request.

Accommodation

In a construction subcontracting offer, the client or main contractor arranges and pays for the team's accommodation for the project period.

The request is saved in our database and delivered to the company mailbox. We do not ask for identity documents, personal codes or bank details; please do not include them in your message.

Do you work in this field?

We are looking for specialists for construction projects in Europe. Fill in the application – suitability for a specific job and country is checked individually.

Roofer · Carpenter · Foreman

Join our European construction teams →

Are you a subcontractor or a crew?

We are looking for long-term partners – subcontractors and crews with their own foreman – for work on European projects.

Become a subcontracting partner →
01Do you also take on flat roofs?

You can request a flat roof package. We publish no project description for one; after checking the documents we confirm or decline your roof and its build-up in the written offer.

02Who provides the scaffold and fall protection?

It depends on the project and is settled before the start. If a scaffold is already up, tell us from when and for what working height. In Germany scaffolding is a craft of its own (Annex A no. 11).

03Who supplies the roofing materials?

Tiles, sheet metal, membranes and timber may come from the client or be part of the package. The offer also sets the boundary for storage and lifting to the roof.

04Can you take on the roof structure as well?

You can request it in the same package: trusses, rafters and decking up to the covering. Carpentry is a craft of its own in Germany, so we check the trade and the composition separately and confirm the result in the offer.

05Does roofing need a licence in Germany?

Yes, it is no. 4 in Annex A of the Handwerksordnung. A foreign company's notification to the chamber comes before the first provision of the service.

06How is bad weather handled in the programme?

There is no blanket rule. The contract sets out how weather stoppages are handled, how the open roof is protected and who reports what. Attach your requirements to the request.

07How does coordination with site management work, and in which language?

Your contact on site is our foreman. The foreman's name and the working language are in the offer, and instructions to the crew come only from the foreman.

08How do I send drawings or a BOQ?

Paste a link to the files in the form (Google Drive, Dropbox, WeTransfer or similar), or email them after you submit, quoting your request number.